DocumentCode :
2428714
Title :
The algorithm of cash flow forecasting in planning stage for construction project
Author :
Kim, Min Ock ; Park, Hyung Keun
Author_Institution :
Sch. of Civil Eng., Chungbuk Nat. Univ., Cheongju, South Korea
fYear :
2012
fDate :
11-13 June 2012
Firstpage :
674
Lastpage :
677
Abstract :
The study suggests an algorithm, which forecasts cash flow in a planning stage to manage a liquidity crisis effectively. The algorithm involves calculation of optimal cash level considering time lag, item costs, and weight of items for construction projects. It also suggests a forecast of cash flow after a comparison of cash-in and cash-out with the simulation of billing time lag according to the earned value and time lag of each item. Forecasts on cash flow, moreover, are made using various simulations on the component ratio of each item according to the budget. Therefore, this study aims to provide a solution to liquidity problems from insufficient cash and a good measure to forecast a proper level of cash flow.
Keywords :
construction industry; financial management; forecasting theory; planning; project management; billing time lag simulation; cash flow forecasting; cash-in; cash-out; construction project; liquidity crisis management; optimal cash level calculation; planning stage; Biological system modeling; Buildings; Companies; Educational institutions; Forecasting; Planning; Predictive models; Algorithm; Cash Flow; Cash-In; Cash-Out; Construction; Time Lag;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Management of Innovation and Technology (ICMIT), 2012 IEEE International Conference on
Conference_Location :
Sanur Bali
Print_ISBN :
978-1-4673-0108-4
Type :
conf
DOI :
10.1109/ICMIT.2012.6225887
Filename :
6225887
Link To Document :
بازگشت