DocumentCode :
243124
Title :
Multi agent based railway scheduling and optimization
Author :
Dalapati, Poulami ; Singh, Arambam James ; Dutta, Arin ; Bhattacharya, Surya
Author_Institution :
Dept. of IT, NIT, Durgapur, India
fYear :
2014
fDate :
22-25 Oct. 2014
Firstpage :
1
Lastpage :
6
Abstract :
This paper proposes a multi agent based timetable scheduling algorithm for railway system which handles the in-between time delay of the newly introduced train. The delay management indeed optimizes the total journey time, hence increases the total utility of the whole railway system as well. Here we show that schedule generated by our proposed algorithm is the most optimized schedule. It is done by using the notion of DCOP(Distributed Constraint Optimization Problem), where we define some metric to analyze the system to achieve our goals. We use JADE(Java Agent DEvelopment Framework) platforms to simulate our work and test it using a small network. We also take a small case study to compare our proposed work with the existing one and the results are therefore presented.
Keywords :
Java; delays; multi-agent systems; optimisation; railways; scheduling; software agents; DCOP; JADE; Java agent development framework; distributed constraint optimization problem; multiagent based timetable scheduling algorithm; railway system; time delay management; Delays; Joining processes; Optimization; Rail transportation; Schedules; Scheduling; Silicon; Distributed Constraint Optimization; Multi agent system; Railway Timetable; Railway scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
TENCON 2014 - 2014 IEEE Region 10 Conference
Conference_Location :
Bangkok
ISSN :
2159-3442
Print_ISBN :
978-1-4799-4076-9
Type :
conf
DOI :
10.1109/TENCON.2014.7022389
Filename :
7022389
Link To Document :
بازگشت