DocumentCode
2434205
Title
Different conditions capacity estimates model at major priority control intersection
Author
Tang, Yangshan
Author_Institution
Coll. of Automobile & Transp., Liaoning Univ. of Technol., Jinzhou, China
fYear
2011
fDate
24-26 June 2011
Firstpage
8208
Lastpage
8210
Abstract
Estimation for non-signalized intersections may be used instead of old single model. It had analyzed M3 headway distribution characters and critical term of the model. The critical application volume scope of the model also was defined. After analyzed minor stream´s passage forms and condition, it had divided conditions into several phases considering headway scopes of major stream. The hypotheses of those phases for capacity estimates then were given. The hypotheses of those phases for capacity estimates then were given. Using methods of generalized integral and probability the estimate model considering several conditions had been established. Compared with single model the model considering different conditions is even adaptive.
Keywords
estimation theory; integral equations; probability; road traffic; M3 headway distribution characters; capacity estimates model; generalized integral; generalized probability; major road priority control intersection; nonsignalized intersection estimation; Adaptation models; Analytical models; Estimation; Load modeling; Roads; Vehicles; capacity estimate; conditions; critcal term; unsignalized intersection;
fLanguage
English
Publisher
ieee
Conference_Titel
Remote Sensing, Environment and Transportation Engineering (RSETE), 2011 International Conference on
Conference_Location
Nanjing
Print_ISBN
978-1-4244-9172-8
Type
conf
DOI
10.1109/RSETE.2011.5964063
Filename
5964063
Link To Document