DocumentCode :
2443013
Title :
An integrated approach of analysing a production system´s PMS: A case study
Author :
Nacereddine, Bouriche ; Mohammed, Kishk ; Moufida, Yahiaoui
Author_Institution :
Dept. of Manage., Univ. of Biskra, Biskra, Algeria
fYear :
2011
fDate :
25-28 Sept. 2011
Firstpage :
390
Lastpage :
394
Abstract :
This study is based on in-depth empirical data taken, as an outside-observer, from a medium-size enterprise. It provides hard evidence of the new non-financial Keys Performance Indicators (KPIs)´ efficiency to evaluate a production system´s (PS) performance. It has been proven that the use of only the internal performance measurement system (PMS) is not enough as a significant measurement. The need of an external performance measurement (PM) is very important. As will be demonstrated the combination between the new non-financial PMSs and the systemic approach; a vital tool to support the continuous improvement of a PS´s performance.
Keywords :
continuous improvement; manufacturing systems; small-to-medium enterprises; continuous improvement; external performance measurement; medium size enterprises; nonfinancial key performance indicators; production system performance evaluation; Educational institutions; Mathematical model; Planning; Production systems; Stress measurement; KPIs; Operation Management; Performance Management; Performance Measurement; Production System;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Business, Engineering and Industrial Applications (ISBEIA), 2011 IEEE Symposium on
Conference_Location :
Langkawi
Print_ISBN :
978-1-4577-1548-8
Type :
conf
DOI :
10.1109/ISBEIA.2011.6088843
Filename :
6088843
Link To Document :
بازگشت