DocumentCode
2443095
Title
The viability of implementing dispute board in Malaysia
Author
Makmor, Maisarah ; Ismail, Zulhabri ; Zulkifly, Umi Kalsum ; Rahim, Faizul Azli Mohd
Author_Institution
Dept. of Quantity Surveying, Univ. of Malaya, Kuala Lumpur, Malaysia
fYear
2011
fDate
25-28 Sept. 2011
Firstpage
415
Lastpage
420
Abstract
This paper is performed mainly to introduce Dispute Board (DB) as the one of the many Alternative Dispute Resolutions (ADRs) to be applied into the Malaysian construction industry to reduce and minimize the amount of disputes. This research is carried out by interviewing nine respondents which consist of registered Quantity Surveyors. Litigation and arbitration has been widely applied in Malaysia for dispute settlement. Both methods, however, do become more tedious and arduous processes to go through to resolve disputes. Mediation, on the other hand, has been a new alternative for dispute settlement in the Malaysian construction industry. Nevertheless, arbitration and mediation have not yet made a big impact in the numbers of disputes arising in the Malaysian construction industry. Therefore, this paper unveils the viability of implementing Dispute Board as a better and more efficient method of ADR that is determined in the outset of the project. Dispute Board is able to reduce the amount of disputes arising in the Malaysian construction industry.
Keywords
construction industry; ADR; DB; Malaysia; alternative dispute resolutions; arbitration; construction industry; dispute board viability; dispute settlement; mediation; quantity surveyors; Companies; Construction industry; Contracts; Interviews; Knowledge engineering; Mediation; Alternative Dispute Resolution (ADR); Dispute Board (DB); Malaysian Construction Industry;
fLanguage
English
Publisher
ieee
Conference_Titel
Business, Engineering and Industrial Applications (ISBEIA), 2011 IEEE Symposium on
Conference_Location
Langkawi
Print_ISBN
978-1-4577-1548-8
Type
conf
DOI
10.1109/ISBEIA.2011.6088849
Filename
6088849
Link To Document