DocumentCode :
2443293
Title :
Reliability cost allocation of protective devices using binary programming
Author :
Darabi, Farshid ; Shooshtari, Alireza Tavakoli ; Babaei, Ehsan ; Darabi, Saeed
Author_Institution :
Dept. Elec. Eng. Sharif, Univ. of Technol., Tehran, Iran
fYear :
2011
fDate :
25-28 Sept. 2011
Firstpage :
469
Lastpage :
474
Abstract :
The problem of location of protective devices is important in distribution networks so the various methods were considered for installation of fuse, recloser, disconnecting switch and breaker. In these methods, a set of protection, economic and reliability aspects are considered. Because of various goals, the optimal approach from some intelligent methods such as genetic algorithm does not get the best approach. At this condition, using mathematic methods is reasonable because they satisfy the best and the optimal approach. Binary programming method is one of these mathematic optimization methods that its speed is high. The problem of location of protective devices is naturally binary in distribution networks. This specification causes using binary programming method for optimal location of protective devices. In this analysis, the binary programming method is implemented for optimal location of protective devices installation in distribution networks. The optimization objective function includes the switching procedure cost and protective devices lifetime cost. Furthermore, the SAIFI and SAIDI analyses beside optimal approaches are calculated. The programmer with reliability consideration easily can choose the optimal possible approach. The proposed method make easy to obtain the best approach with protection consideration and etc. To analyze proposed method, a test network is considered. At a distribution network, the breaker is located in the beginning of the network so the simulation result can be extended to obtain the optimal location for recloser, fuse and disconnecting switch. The proposed method is obtained from Visual Studio C# .NET software.
Keywords :
circuit breakers; electric fuses; genetic algorithms; power distribution economics; power distribution protection; power distribution reliability; SAIDI analyses; SAIFI analyses; Visual Studio C# .NET software; binary programming method; disconnecting breaker installation; disconnecting switch installation; distribution network; fuse installation; genetic algorithm; mathematic optimization method; optimization objective function; protective device lifetime cost; protective device location; recloser installation; reliability cost allocation; switching procedure cost; Fuses; Indexes; Power system reliability; Programming; Reliability; Switches; Visualization; Visual Studio C#; binary programming; disconnecting switch; fuse; recloser;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Business, Engineering and Industrial Applications (ISBEIA), 2011 IEEE Symposium on
Conference_Location :
Langkawi
Print_ISBN :
978-1-4577-1548-8
Type :
conf
DOI :
10.1109/ISBEIA.2011.6088860
Filename :
6088860
Link To Document :
بازگشت