DocumentCode :
2443478
Title :
Hydration temperature measurement and analysis of cast-in-situ box girder segment on top of pier
Author :
Nie, Yudong ; Wang, Zonglin
Author_Institution :
Sch. of Transp. Sci. & Eng., Harbin Inst. of Technol., Harbin, China
fYear :
2011
fDate :
24-26 June 2011
Firstpage :
1269
Lastpage :
1273
Abstract :
Based on one 160m PC bridge project, the field measurement and finite element analysis of the hydration temperature of cast-in-situ box girder on top of pier have been completed. The distribution of the hydration temperature fields and the rule of the temperature changing with time have been summed up in this paper. The factors which affect the hydration temperature of cast-in-situ box girder on top of pier were also under discussion here. At last, some measures were put forward to control hydration heat and early age cracking in the cast-in-situ box girder on top of pier.
Keywords :
beams (structures); cracks; finite element analysis; heat transfer; structural engineering; PC bridge project; cast-in-situ box girder segment; cracking; field measurement; finite element analysis; hydration heat control; hydration temperature; hydration temperature measurement; Concrete; Ocean temperature; Presses; Stress; Structural beams; Temperature; Temperature measurement; cast-in-situ box girder on top of pier; finite element analysis; hydration heat; mass concrete; temperature measurement;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Remote Sensing, Environment and Transportation Engineering (RSETE), 2011 International Conference on
Conference_Location :
Nanjing
Print_ISBN :
978-1-4244-9172-8
Type :
conf
DOI :
10.1109/RSETE.2011.5964511
Filename :
5964511
Link To Document :
بازگشت