DocumentCode :
2451664
Title :
Increase in electrical system reliability and reduction in maintenance cost through improved design engineering
Author :
M, Usha Vasudev
Author_Institution :
Indian Oil Corp. Ltd., Gujarat, India
Volume :
1
fYear :
2003
fDate :
12-16 Oct. 2003
Firstpage :
97
Abstract :
Gujarat refinery has been expanding over the years with various process units. To meet additional loads, in-house energy generation was increased with new plants. In this process, there were many power failures, some of them being total which resulted in enormous losses. This paper describes how in-house studies and corrective actions helped to bring down such failures by 90% within three years and no total failure occurred since 1999.
Keywords :
cogeneration; industrial power systems; maintenance engineering; oil refining; power distribution; power system economics; power system reliability; thermal power stations; 11 kV; 6.9 kV; 66 kV; Gujarat refinery; Indian Oil Corporation Limited; cogeneration power station; design engineering; electrical system reliability increase; in-house energy generation; losses; maintenance cost reduction; power failures; thermal power station; Costs; Design engineering; FCC; Feeds; Integrated circuit interconnections; Maintenance; Power generation; Reliability; Substations; Switchgear;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industry Applications Conference, 2003. 38th IAS Annual Meeting. Conference Record of the
Print_ISBN :
0-7803-7883-0
Type :
conf
DOI :
10.1109/IAS.2003.1257489
Filename :
1257489
Link To Document :
بازگشت