DocumentCode
2453049
Title
Optimizing in advance: Shenzhou 8 space mission scheduling tryout architecture
Author
Jinjiang, Xing ; Jian, Li ; Hua, Zhu ; Hong, Zhou ; Yuncheng, Feng
Author_Institution
Beijing Aerosp. Control Center, Beijing, China
fYear
2010
fDate
24-27 Aug. 2010
Firstpage
152
Lastpage
155
Abstract
To provide best scheduling solution for the Shenzhou 8 space mission, the scheduling algorithms and configurations are determined before actual mission platform developing using a tryout architecture in Beijing Aerospace Control Center. The architecture is designed agile and extendable so that various processes can be implemented to validate and optimize the algorithms rapidly. With this architecture, the scheduling solution is designed credible before applied in the formal mission scheduling mainframes.
Keywords
aerospace computing; optimisation; scheduling; Beijing Aerospace Control Center; optimization; space mission scheduling; tryout architecture; Algorithm design and analysis; Computer architecture; Schedules; Scheduling; Scheduling algorithm; Space missions; Switches; Shenzhou; optimizing; scheduling; space mission; spaceship; tryout;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Science and Education (ICCSE), 2010 5th International Conference on
Conference_Location
Hefei
Print_ISBN
978-1-4244-6002-1
Type
conf
DOI
10.1109/ICCSE.2010.5593670
Filename
5593670
Link To Document