• DocumentCode
    2455679
  • Title

    Optimal instrument selection

  • Author

    Marion, Randall L.

  • fYear
    2002
  • fDate
    2002
  • Firstpage
    249
  • Lastpage
    260
  • Abstract
    Optimal instrument selection requires selection of a comparison methodology and conversion of instrument parameters to a common basis. Life cycle cost is an ideal comparison methodology because the conversion to cost/benefit (dollars) is familiar to most engineers. Examples of life cycle cost difference studies are given.
  • Keywords
    instrumentation; life cycle costing; comparison methodology; instrument parameters; life cycle cost; optimal instrument selection; Automatic testing; Cooling; Costs; Degradation; Instruments; Life testing; Plugs; Software standards; Software testing; Throughput;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    AUTOTESTCON Proceedings, 2002. IEEE
  • ISSN
    1080-7725
  • Print_ISBN
    0-7803-7441-X
  • Type

    conf

  • DOI
    10.1109/AUTEST.2002.1047896
  • Filename
    1047896