DocumentCode
2462891
Title
Harbin metro interval monitoring results and data analysis
Author
Wang, Xiaohui ; Zhang, Yin ; Lu, Junlong
Author_Institution
Coll. of Civil Eng., Xi´´an Univ. of Archit. & Technol., Xi´´an, China
fYear
2011
fDate
24-26 June 2011
Firstpage
5015
Lastpage
5017
Abstract
Metro amount of ground during excavation and tunnel crown settlement and the amount of physical and mechanical properties of overburden, overburden thickness, and the excavation of the upper surface of the shape of the load, and many other factors. In this paper, the monitoring of land subsidence subway, on the subway excavation of ground observation data analysis, the results show that the surface deformation monitoring points with regularity.
Keywords
condition monitoring; construction; data analysis; geotechnical engineering; tunnels; Harbin metro interval monitoring; data analysis; excavation; land subsidence subway; overburden thickness; physical-mechanical properties; surface deformation monitoring points; tunnel crown settlement; Civil engineering; Computational modeling; Data analysis; Educational institutions; Monitoring; Robustness; Tunneling; data analysis; excavation interval; monitoring results; subway;
fLanguage
English
Publisher
ieee
Conference_Titel
Remote Sensing, Environment and Transportation Engineering (RSETE), 2011 International Conference on
Conference_Location
Nanjing
Print_ISBN
978-1-4244-9172-8
Type
conf
DOI
10.1109/RSETE.2011.5965439
Filename
5965439
Link To Document