• DocumentCode
    2462891
  • Title

    Harbin metro interval monitoring results and data analysis

  • Author

    Wang, Xiaohui ; Zhang, Yin ; Lu, Junlong

  • Author_Institution
    Coll. of Civil Eng., Xi´´an Univ. of Archit. & Technol., Xi´´an, China
  • fYear
    2011
  • fDate
    24-26 June 2011
  • Firstpage
    5015
  • Lastpage
    5017
  • Abstract
    Metro amount of ground during excavation and tunnel crown settlement and the amount of physical and mechanical properties of overburden, overburden thickness, and the excavation of the upper surface of the shape of the load, and many other factors. In this paper, the monitoring of land subsidence subway, on the subway excavation of ground observation data analysis, the results show that the surface deformation monitoring points with regularity.
  • Keywords
    condition monitoring; construction; data analysis; geotechnical engineering; tunnels; Harbin metro interval monitoring; data analysis; excavation; land subsidence subway; overburden thickness; physical-mechanical properties; surface deformation monitoring points; tunnel crown settlement; Civil engineering; Computational modeling; Data analysis; Educational institutions; Monitoring; Robustness; Tunneling; data analysis; excavation interval; monitoring results; subway;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Remote Sensing, Environment and Transportation Engineering (RSETE), 2011 International Conference on
  • Conference_Location
    Nanjing
  • Print_ISBN
    978-1-4244-9172-8
  • Type

    conf

  • DOI
    10.1109/RSETE.2011.5965439
  • Filename
    5965439