• DocumentCode
    2465988
  • Title

    The characters and management of typical landslide in Motuo highway, Tibet

  • Author

    Liu, Jingjing ; Tang, Chuan ; Cheng, Zunlan

  • Author_Institution
    Key Lab. of Mountain Hazards & Surface Process, Inst. of Mountain Hazards & Environ., Chengdu, China
  • fYear
    2011
  • fDate
    24-26 June 2011
  • Firstpage
    5503
  • Lastpage
    5506
  • Abstract
    The starting point of Motuo highway is Zhamu Bridge in Zhamu Town of Bomi County, and the end point of it is Lianhua Square of Motuo County. The whole length of highway is 117.3km. After Galongla Tunnel has been completed, a series of landslides along the highway can not be ignored. According to the field observation in 2006, 2007 and 2008, there were 66 landslides and rockfalls. In this paper, the K85 landslide between K85+500 and K85+580 in the highway is studied. This landslide is a small debris landslide of middle traction. The material, shape, deformation and environment are analyzed, the stability is calculated, and prevention measures are proposed.
  • Keywords
    geomorphology; rocks; tunnels; Galongla tunnel; K85 landslide; Motuo highway; Tibet; Zhamu town; highway; landslide management; landslides; rockfalls; Hazards; Nickel; Presses; Road transportation; Surface treatment; Terrain factors; Water conservation; Motuo highway; Tibet; characters; management; typical landslide;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Remote Sensing, Environment and Transportation Engineering (RSETE), 2011 International Conference on
  • Conference_Location
    Nanjing
  • Print_ISBN
    978-1-4244-9172-8
  • Type

    conf

  • DOI
    10.1109/RSETE.2011.5965592
  • Filename
    5965592