DocumentCode :
2466328
Title :
Heuristic methods for minimizing resource availability costs in multi-mode project scheduling
Author :
Chen, Long ; Li, Xiaoping ; Cai, Zhicheng
Author_Institution :
Comput. Sci. & Eng., Southeast Univ., Nanjing, China
fYear :
2012
fDate :
14-17 Oct. 2012
Firstpage :
809
Lastpage :
813
Abstract :
In this paper, a multi-mode project scheduling problem with deadline constraints is considered to minimize the resource availability cost. Modes of each activity are associated with different durations and renewable resources. Three kinds of rules are developed for activity selection, mode assignment, and time decision, respectively. A lot of combinations of the three kind rules are compared and the choosing probabilities are determined, based on which a regret probability based stochastic (RPBS) method is proposed for the considered problem. Computational results demonstrate that the RPBS method outperforms the existing one and the rule combinations in effectiveness but with a little more computation time.
Keywords :
minimisation; probability; project management; scheduling; stochastic processes; activity selection; choosing probability; deadline constraint; heuristic method; mode assignment; multimode project scheduling; regret probability based stochastic method; renewable resource; resource availability cost minimisation; rule combination; time decision; Availability; Europe; Probability; Processor scheduling; Schedules; Scheduling; Stochastic processes; heuristic methods; multi-mode; project scheduling; resource availability cost;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Systems, Man, and Cybernetics (SMC), 2012 IEEE International Conference on
Conference_Location :
Seoul
Print_ISBN :
978-1-4673-1713-9
Electronic_ISBN :
978-1-4673-1712-2
Type :
conf
DOI :
10.1109/ICSMC.2012.6377827
Filename :
6377827
Link To Document :
بازگشت