Title :
Value-based product development: refocusing lean
Author :
Browning, Tyson R.
Author_Institution :
Lockheed Martin Aeronaut. Co., Fort Worth, TX, USA
Abstract :
Lean is not minimizing cost, cycle time, or waste. Lean is maximizing value. In product development (PD), sometimes getting lean requires doing more, not less. Providing a preferred combination of product performance, affordability and availability requires a lean PD process. Product value is affected not only by the presence of necessary activities in the PD process but also by the way those activities work together to ensure that they use and produce right information. Lean PD requires the right information at the right place at the right time
Keywords :
product development; research and development management; value engineering; affordability; availability; lean product development process; product performance; value-based product development; Availability; Costs; Flexible manufacturing systems; Job shop scheduling; Lean production; Product development; Robustness; Shape;
Conference_Titel :
Engineering Management Society, 2000. Proceedings of the 2000 IEEE
Conference_Location :
Albuquerque, NM
Print_ISBN :
0-7803-6442-2
DOI :
10.1109/EMS.2000.872495