DocumentCode
2470928
Title
A novel algorithm for long-term load forecasting of distribution networks under redevelopment conditions
Author
Mccarthy, Christopher ; Edmonds, Michael ; Jayantilal, Avnaesh ; Boardman, Ethan
Author_Institution
S&C Electric Company - USA
fYear
213
fDate
10-13 June 213
Firstpage
1
Lastpage
4
Abstract
This paper describes the benefits of layered intelligence between an Integrated Distribution Management System (IDMS) platform and Distribution Automation (DA) range of automated feeder switches and fault interrupting devices. The IDMS is capable of aggregating all local and central intelligence, whilst DA devices are able to actively manage and correct for faults in the field. The integrated solution combines rapid, real-time response to system conditions using distributed intelligence, small-area optimization using regional area controls, and overall system level view and wide-area optimization from enterprise-level applications. This represents a significant step forward for the industry, because it is a truly integrated solution — not just an interoperable solution — enhancing operator usability and situational awareness. By providing an integrated solution, utilities are now able to deploy smart grid technologies with confidence that the true value of these technologies is being capitalized to enhance end use customer satisfaction from improved grid reliability.
fLanguage
English
Publisher
iet
Conference_Titel
Electricity Distribution (CIRED 2013), 22nd International Conference and Exhibition on
Conference_Location
Stockholm
Electronic_ISBN
978-1-84919-732-8
Type
conf
DOI
10.1049/cp.2013.0777
Filename
6683380
Link To Document