• DocumentCode
    2473578
  • Title

    Revitalisation of distribution network

  • Author

    Abdulkarim, A.H. ; Altahoo, A.M.

  • Author_Institution
    Electr. Distribution Directorate, Bahrain
  • fYear
    1994
  • fDate
    12-14 Dec 1994
  • Firstpage
    152
  • Lastpage
    154
  • Abstract
    The island of Bahrain is served via over 3200 ground-mounted 11 kV/415 V distribution substations (comprising a ring main unit, a transformer, and a low voltage panel) and over 750 pole mounted transformers with much of the network underground. Such severe operating conditions are taking their toll on the distribution plant. Much of the equipment in use were not designed to operate at such ambient temperatures and hence, measures had to be taken towards derating some of the equipment in use. Here, the authors present an outline of the revitalisation project for the Bahrain distribution network
  • Keywords
    distribution networks; maintenance engineering; power transformers; project engineering; substations; underground distribution systems; 11 kV; 415 V; Bahrain; derating; distribution network; low voltage; revitalisation project; ring main; substations; transformer; underground;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Life Management of Power Plants, 1994., International Conference on
  • Conference_Location
    Edinburgh
  • Print_ISBN
    0-85296-627-X
  • Type

    conf

  • DOI
    10.1049/cp:19941108
  • Filename
    378844