DocumentCode :
2477345
Title :
Fiber in the loop implementation-a moving target
Author :
Jensen, J.D.
Author_Institution :
Ameritech Services, IL, USA
fYear :
1993
fDate :
15-18 Nov 1993
Firstpage :
128
Lastpage :
129
Abstract :
The move to bring fiber into the neighborhoods began in earnest in 1988 with the BellSouth fiber to the home trial in Orlando, Florida. Billed as the harbinger of things to come, the system installed delivered ISDN and digitally encoded switched video the community. Today´s vision of FITL will be influenced by several factors which will work to shape the ultimate design and functionality of the platform. These items, summarized as competition and regulation, will determine the magnitude of deployment in this decade
Keywords :
ISDN; optical fibre subscriber loops; visual communication; BellSouth; FITL; Florida; ISDN; Orlando; competition; digitally encoded switched video; fiber in the loop; fiber to the home; regulation; Costs; Foot; ISDN; Narrowband; Optical fiber cables; Optical fiber devices; Optical fiber networks; Power cables; Telephony; Video sharing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Lasers and Electro-Optics Society Annual Meeting, 1993. LEOS '93 Conference Proceedings. IEEE
Conference_Location :
San Jose, CA
Print_ISBN :
0-7803-1263-5
Type :
conf
DOI :
10.1109/LEOS.1993.379028
Filename :
379028
Link To Document :
بازگشت