DocumentCode
2478300
Title
Verifying the indication method for high-resistance earth faults implemented in centralized protection system
Author
Nikander, A. ; Valtari, Jani ; Raipala, Ontrei ; Kettunen, Erkka
Author_Institution
Tampere Univ. of Technol., Tampere, Finland
fYear
213
fDate
10-13 June 213
Firstpage
1
Lastpage
4
Abstract
The paper presents verifying test results of the primary substation level centralized functionality in laboratory. The attention is concentrated to verifying the indication method for high-resistance phase-to-earth faults in neutral isolated and compensated networks. The applied method is based on the studies and results carried out in TUT. For properly testing the test environment needed to be set up for centralized functionality. This environment was set up in TUT and it utilizes the Real Time Digital Simulator (RTDS®). The indication method for high-resistance earth faults has been implemented as centralized in order to test the new technology. It utilizes new possibilities of the centralized protection system. The essential method in this study was RTDS simulations of centralized protection system.
Keywords
earthing; fault diagnosis; substation protection; RTDS simulations; TUT; centralized protection system; compensated networks; high-resistance phase-to-earth faults; neutral isolated networks; primary substation level centralized functionality; real time digital simulator;
fLanguage
English
Publisher
iet
Conference_Titel
Electricity Distribution (CIRED 2013), 22nd International Conference and Exhibition on
Conference_Location
Stockholm
Electronic_ISBN
978-1-84919-732-8
Type
conf
DOI
10.1049/cp.2013.1130
Filename
6683733
Link To Document