• DocumentCode
    2479777
  • Title

    Residual-Balanced Spanning Tree Problem of Topology-Aware ALM

  • Author

    Cui, Jianqun ; Jia, Keming ; Wu, Libing

  • Author_Institution
    Dept. of Comput. Sci., Huazhong Normal Univ., Wuhan, China
  • fYear
    2010
  • fDate
    22-23 May 2010
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Topology-aware application layer multicast takes the real underlying physical network connections into consideration while constructing multicast tree. The aim is to shorten end-to-end data forwarding delay, but it may lead to some end systems with high bandwidth close to the source node need to provide data forwarding service for many sub-nodes, and finally become the bottleneck of the multicast tree. To balance the requirement mentioned above, we propose a more comprehensive problem model MDDLRB (Minimum Delay, Degree-Limited Residual-Balanced) to construct application layer multicast spanning tree. Furthermore, to solve the MDDLRB problem, we present a heuristic algorithm based on delay increment and equilibrium optimization strategy. The simulation results show that the algorithm can get a better system performance.
  • Keywords
    multicast communication; trees (mathematics); MDDLRB; application layer multicast spanning tree; end-to-end data forwarding delay; equilibrium optimization strategy; minimum delay degree-limited residual- balanced; physical network connections; residual-balanced spanning tree problem; topology-aware ALM; Application software; Bandwidth; Computer networks; Computer science; Delay; Heuristic algorithms; Multicast algorithms; Physics computing; Routing; Telecommunication traffic;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Systems and Applications (ISA), 2010 2nd International Workshop on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-5872-1
  • Electronic_ISBN
    978-1-4244-5874-5
  • Type

    conf

  • DOI
    10.1109/IWISA.2010.5473348
  • Filename
    5473348