DocumentCode :
2480466
Title :
An Exact Method for U-Shaped Assembly Line Balancing Problem
Author :
Zhang, Zeqiang ; Cheng, Wenming
Author_Institution :
Scholl of Mech. Eng., Southwest Jiaotong Univ., Chengdu, China
fYear :
2010
fDate :
22-23 May 2010
Firstpage :
1
Lastpage :
4
Abstract :
U-shaped assembly lines have been adopted in many manufacturing settings as part of just-in-time production principle. U-shaped line balancing problem (ULBP) is an extension of the traditional line balancing problem, in which tasks can be assigned from both sides of the precedence graph. In this paper, based on the integer programming formulation developed by Urban, the solving procedure for ULBP is constructed by the syntax of Lingo 9.0 extended version. An illustrative example is followed to describe the detailed solving procedure. The results of the computational study show that the procedure is effectively.
Keywords :
assembling; graph theory; integer programming; production engineering computing; Lingo 9.0; U-shaped assembly line balancing problem; integer programming; precedence graph; Assembly systems; Imaging phantoms; Linear programming; Manufacturing; Mathematical model; Mechanical engineering; Production systems; Switches; Time measurement; Workstations;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Systems and Applications (ISA), 2010 2nd International Workshop on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-5872-1
Electronic_ISBN :
978-1-4244-5874-5
Type :
conf
DOI :
10.1109/IWISA.2010.5473379
Filename :
5473379
Link To Document :
بازگشت