Abstract
New technologies and methods have been applied to a 230 kV transmission line uprating project. Significant savings have been documented in field investigation efforts, data collection, design time, line outages and construction costs. Advancements in software and data collection instruments have been combined with innovative line engineering to improve the accuracy and reduce the costs of uprating projects. Laser surveying, span-by-span resagging and conductor temperature measurements have been combined to increase the ampacity rating by 30%, at a fraction of the cost of traditional uprating.
Keywords
maintenance engineering; power transmission lines; project engineering; 230 kV; ampacity rating; conductor temperature measurements; construction costs; data collection; design time; field investigation; laser surveying; line outages; span-by-span resagging; transmission line uprating technologies; uprating project; Circuits; Clamps; Conductors; Costs; Insulation; Performance evaluation; Power transmission lines; Temperature; Transmission lines; Wire;
fLanguage
English
Publisher
ieee
Conference_Titel
Transmission & Distribution Construction, Operation & Live-Line Maintenance Proceedings, 1998. ESMO '98. 1998 IEEE 8th International Conference on
Conference_Location
Orlando, FL, USA
Print_ISBN
0-7803-4883-4
Type
conf
DOI
10.1109/TDCLLM.1998.668396
Filename
668396
Link To Document