The control model of engineering cost in construction phase of high-speed railway
Author :
Lihua, Liu ; Yikun, Su
Author_Institution :
Coll. of Civil Eng., Changchun Inst. of Technol., Changchun, China
fDate :
Nov. 30 2010-Dec. 2 2010
Abstract :
To improve the efficiency of cost control in the high speed railway construction phase, we set up the model of earned value and install FBCWS index, through the contrast between FBCWS index and ACWP´ index, we improve the efficiency of cost control in construction stage, so that we can do the better in the direction and control before costs incurred and make the construction cost control management more scientifically and effectively in the construction phase of high-speed rail project.
Keywords :
civil engineering; costing; investment; project management; railway engineering; ACWP index; FBCWS index; construction cost control management; earned value; engineering cost control; high speed rail project; Driver circuits; Indexes; Investments; Materials; Rail transportation; Rails; Schedules; Cost contral; Costing; Earned value; High-speed railway;
Conference_Titel :
Computer Sciences and Convergence Information Technology (ICCIT), 2010 5th International Conference on
Conference_Location :
Seoul
Print_ISBN :
978-1-4244-8567-3
Electronic_ISBN :
978-89-88678-30-5
DOI :
10.1109/ICCIT.2010.5711158