    The control model of engineering cost in construction phase of high-speed railway

  • Author

    Lihua, Liu ; Yikun, Su

  • Author_Institution
    Coll. of Civil Eng., Changchun Inst. of Technol., Changchun, China
  • fYear
    2010
  • fDate
    Nov. 30 2010-Dec. 2 2010
  • Firstpage
    766
  • Lastpage
    771
  • Abstract
    To improve the efficiency of cost control in the high speed railway construction phase, we set up the model of earned value and install FBCWS index, through the contrast between FBCWS index and ACWP´ index, we improve the efficiency of cost control in construction stage, so that we can do the better in the direction and control before costs incurred and make the construction cost control management more scientifically and effectively in the construction phase of high-speed rail project.
  • Keywords
    civil engineering; costing; investment; project management; railway engineering; ACWP index; FBCWS index; construction cost control management; earned value; engineering cost control; high speed rail project; Driver circuits; Indexes; Investments; Materials; Rail transportation; Rails; Schedules; Cost contral; Costing; Earned value; High-speed railway;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Sciences and Convergence Information Technology (ICCIT), 2010 5th International Conference on
  • Conference_Location
    Seoul
  • Print_ISBN
    978-1-4244-8567-3
  • Electronic_ISBN
    978-89-88678-30-5
  • Type

    conf

  • DOI
    10.1109/ICCIT.2010.5711158
  • Filename
    5711158