The control model of engineering cost in construction phase of high-speed railway
Author
Lihua, Liu ; Yikun, Su
Author_Institution
Coll. of Civil Eng., Changchun Inst. of Technol., Changchun, China
fYear
2010
fDate
Nov. 30 2010-Dec. 2 2010
Firstpage
766
Lastpage
771
Abstract
To improve the efficiency of cost control in the high speed railway construction phase, we set up the model of earned value and install FBCWS index, through the contrast between FBCWS index and ACWP´ index, we improve the efficiency of cost control in construction stage, so that we can do the better in the direction and control before costs incurred and make the construction cost control management more scientifically and effectively in the construction phase of high-speed rail project.
Keywords
civil engineering; costing; investment; project management; railway engineering; ACWP index; FBCWS index; construction cost control management; earned value; engineering cost control; high speed rail project; Driver circuits; Indexes; Investments; Materials; Rail transportation; Rails; Schedules; Cost contral; Costing; Earned value; High-speed railway;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Sciences and Convergence Information Technology (ICCIT), 2010 5th International Conference on
Conference_Location
Seoul
Print_ISBN
978-1-4244-8567-3
Electronic_ISBN
978-89-88678-30-5
Type
conf
DOI
10.1109/ICCIT.2010.5711158
Filename
5711158
Link To Document