Title :
A determining model on total investment, project life, and concession period interval for BOT projects
Author :
Bao, Haijun ; Wang, Hongdi
Author_Institution :
Coll. of Bus. Adm., Zhejiang Univ. of Finance &Econ., Hangzhou, China
fDate :
Nov. 30 2010-Dec. 2 2010
Abstract :
To properly determine the concession period is one of the most important questions of BOT (Build-Operate-Transfer) projects. Project life and total investment are always pre-given in extant models such as ACM and RCM, which needs more discussion. Social benefit is one crucial factor for a host government to accelerate infrastructure construction by the BOT mechanism, which has been much more concerned by scholars. In this article, a determining model on total investment, project life, and concession period interval for BOT projects has been established. We unlock the premise that total investment and project life are pre-given, and aim to maximize the total benefit of the host government including economic and social benefit while ensuring that the private enterprises will receive a certain profit, finally determining the ideal project life and total investment, hence obtaining the concession period interval. The determining model enables a better progress of the negotiation between the host government and private enterprises.
Keywords :
investment; profitability; project management; public finance; socio-economic effects; BOT project; build operate transfer; concession period; government factor; private enterprise; project life; social economic benefit; total investment; Biological system modeling; Contracts; Economics; Equations; Government; Investments; Mathematical model; BOT; Concession Period; Project life; Social benefit; Total investment;
Conference_Titel :
Computer Sciences and Convergence Information Technology (ICCIT), 2010 5th International Conference on
Conference_Location :
Seoul
Print_ISBN :
978-1-4244-8567-3
Electronic_ISBN :
978-89-88678-30-5
DOI :
10.1109/ICCIT.2010.5711161