DocumentCode :
2483670
Title :
Key factors influencing the decision-making of lump-sum contracting project delivery methods in China
Author :
Xuetong, Wang
Author_Institution :
Sch. of Bus., Guangzhou Univ., Guangzhou, China
fYear :
2010
fDate :
Nov. 30 2010-Dec. 2 2010
Firstpage :
798
Lastpage :
802
Abstract :
20 factors are selected to frame a primary factor set from 38 factors obtained through literature study. The methods of Mean Score and Ranking Agreement Factor are applied to calculate the sorting order and analyze the consistency of market survey data. The results show that 17 factors concerning owner´s engineering capabilities, owner´s preferences to project construction, project properties, and lump-sum contracting market conditions exert a profound influence on the decision-making of lump-sum contracting project delivery methods. Finally, countermeasures and suggestions are proposed to promote a rapid and sound development of lump-sum contracting system in Chinese construction industry.
Keywords :
civil engineering; construction industry; contracts; decision making; project engineering; project management; Chinese construction industry; decision making; lump sum contracting project delivery methods; mean score methods; project construction; ranking agreement factor; Construction industry; Contracts; Decision making; Government; Investments; Materials; Resource management; decision-making; influencing factors; lump-sum contract; project delivery methods;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer Sciences and Convergence Information Technology (ICCIT), 2010 5th International Conference on
Conference_Location :
Seoul
Print_ISBN :
978-1-4244-8567-3
Electronic_ISBN :
978-89-88678-30-5
Type :
conf
DOI :
10.1109/ICCIT.2010.5711165
Filename :
5711165
Link To Document :
بازگشت