• DocumentCode
    2486833
  • Title

    Pondering proper PAR pricing

  • Author

    Lesieutre, Bernard C. ; Alvarado, Fernando L.

  • Author_Institution
    Univ. of Wisconsin -Madison, Madison
  • fYear
    2007
  • fDate
    19-24 Aug. 2007
  • Firstpage
    1
  • Lastpage
    7
  • Abstract
    We have examined the potential impacts of PAR devices on system LMPs. Since fixed-offset and fixed-flow controls impact the incremental capabilities of the network differently, then in theory they should impact the LMPs differently. We demonstrate this effect through examples. Depending on topology, limits, and PAR placement, the relative values for the LMPs will be vary. In some cases the fixed-flow operation may result in lower LMPs, and in other cases the fixed-offset will result in lower LMPs. We have also briefly noted that there can be advantages to operating the PAR in a hybrid mode in which the phase angle may be set to control fixed-offset, fixed-flow, or even fixed-flow on a different path, depending on system conditions.
  • Keywords
    power markets; power system economics; incremental capabilities; locational marginal prices; phase angle regulators pricing; power markets; Control systems; Power generation economics; Power markets; Power system dynamics; Power system reliability; Power systems; Pricing; Protocols; Transformers; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Bulk Power System Dynamics and Control - VII. Revitalizing Operational Reliability, 2007 iREP Symposium
  • Conference_Location
    Charleston, SC
  • Print_ISBN
    978-1-4244-1519-9
  • Electronic_ISBN
    978-1-4244-1519-9
  • Type

    conf

  • DOI
    10.1109/IREP.2007.4410529
  • Filename
    4410529