DocumentCode
2487610
Title
The research of trailer scheduling based on the hybrid flow shop problem with blocking
Author
Zhang, Yu ; Wang, Shaomei
Author_Institution
Wuhan Univ. of Technol., Wuhan
fYear
2008
fDate
25-27 June 2008
Firstpage
3936
Lastpage
3940
Abstract
With the regard of trailer scheduling problem, the hybrid flow shop problem with blocking (HFS-B) was introduced to analyze the flow of container with different attributes (import container, export container) in order to describe and optimize trailer scheduling problem. The mathematics model that was described using HFS-B with attribute for trailer scheduling problem was setup. The four section chromosomes based on the coding of job form and machine form were constructed. The weight approach was introduced to solve multi-objective problem of trailer scheduling. At last an instance of trailer dynamic scheduling based on HFS-B with output container attribute was simulated and the outputting data were compared with the data of trailer static scheduling. It showed that the method could effectually solve the trailer scheduling problem.
Keywords
containers; flow shop scheduling; goods distribution; export container; hybrid flow shop problem with blocking; import container; trailer dynamic scheduling; Automation; Biological cells; Bismuth; Containers; Dynamic scheduling; Intelligent control; Job shop scheduling; Mathematical model; Mathematics; GA; hybrid flow shop; scheduling; simulating; trailer;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Control and Automation, 2008. WCICA 2008. 7th World Congress on
Conference_Location
Chongqing
Print_ISBN
978-1-4244-2113-8
Electronic_ISBN
978-1-4244-2114-5
Type
conf
DOI
10.1109/WCICA.2008.4593558
Filename
4593558
Link To Document