• DocumentCode
    2487887
  • Title

    Model and algorithm for integrated charge plan in the steel industry

  • Author

    Dong, Hongyu ; Huang, Min ; Wang, Xingwei ; Zheng, Binglin

  • Author_Institution
    Fac. of Inf. Sci. & Eng., Northeastern Univ., Shenyang
  • fYear
    2008
  • fDate
    25-27 June 2008
  • Firstpage
    4030
  • Lastpage
    4034
  • Abstract
    According to the demand of integrated production and the characteristic of charge plan in the steel industry, firstly, use graph theory to describe charge plan; secondly, a bi-objective charge plan model is introduced in detail considering weight range, flow limitation and other factors; To solve this model, a two-phase heuristic algorithm (THA) is introduced, which deals with the simple graph with vertex clustering method firstly, and then design a novel probability match algorithm to solve the optimization model; Finally, the simulation with large-scale production data shows that the model and algorithm is feasible.
  • Keywords
    probability; production planning; steel industry; bi-objective charge plan model; integrated charge plan; large-scale production data; optimization model; probability match algorithm; steel industry; two-phase heuristic algorithm; vertex clustering method; Casting; Clustering algorithms; Continuous production; Design automation; Graph theory; Heuristic algorithms; Metals industry; Slabs; Solids; Steel; charge plan; large-scale combinatorial optimization; probability match algorithm; two-phase heuristic algorithm;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Control and Automation, 2008. WCICA 2008. 7th World Congress on
  • Conference_Location
    Chongqing
  • Print_ISBN
    978-1-4244-2113-8
  • Electronic_ISBN
    978-1-4244-2114-5
  • Type

    conf

  • DOI
    10.1109/WCICA.2008.4593573
  • Filename
    4593573