DocumentCode :
2487887
Title :
Model and algorithm for integrated charge plan in the steel industry
Author :
Dong, Hongyu ; Huang, Min ; Wang, Xingwei ; Zheng, Binglin
Author_Institution :
Fac. of Inf. Sci. & Eng., Northeastern Univ., Shenyang
fYear :
2008
fDate :
25-27 June 2008
Firstpage :
4030
Lastpage :
4034
Abstract :
According to the demand of integrated production and the characteristic of charge plan in the steel industry, firstly, use graph theory to describe charge plan; secondly, a bi-objective charge plan model is introduced in detail considering weight range, flow limitation and other factors; To solve this model, a two-phase heuristic algorithm (THA) is introduced, which deals with the simple graph with vertex clustering method firstly, and then design a novel probability match algorithm to solve the optimization model; Finally, the simulation with large-scale production data shows that the model and algorithm is feasible.
Keywords :
probability; production planning; steel industry; bi-objective charge plan model; integrated charge plan; large-scale production data; optimization model; probability match algorithm; steel industry; two-phase heuristic algorithm; vertex clustering method; Casting; Clustering algorithms; Continuous production; Design automation; Graph theory; Heuristic algorithms; Metals industry; Slabs; Solids; Steel; charge plan; large-scale combinatorial optimization; probability match algorithm; two-phase heuristic algorithm;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Control and Automation, 2008. WCICA 2008. 7th World Congress on
Conference_Location :
Chongqing
Print_ISBN :
978-1-4244-2113-8
Electronic_ISBN :
978-1-4244-2114-5
Type :
conf
DOI :
10.1109/WCICA.2008.4593573
Filename :
4593573
Link To Document :
بازگشت