Title :
Combining an Optimizing Method with a Genetic Algorithm to Solve a Flowshop Scheduling Problem with Additional Resources
Author_Institution :
Lazarski Sch. of Commerce & Law, Warsaw
Abstract :
In this paper the problem of preemptive scheduling in a flowshop with parallel unrelated machines and renewable resources is considered. A heuristic algorithm which combines an optimizing procedure solving the resource constrained scheduling problem with a genetic algorithm is proposed. The objective is to minimize makespan. A lower bound on the optimal makespan is derived. The performance of the heuristic algorithm is analyzed by a computational experiment. The results show that the proposed heuristic algorithm is an effective tool for solving large size problems.
Keywords :
flow shop scheduling; genetic algorithms; parallel machines; flowshop scheduling; genetic algorithm; optimal makespan; parallel unrelated machines; preemptive scheduling; resource constrained scheduling; Business; Chemical industry; Food industry; Genetic algorithms; Heuristic algorithms; Job shop scheduling; Optimization methods; Parallel machines; Space technology; Testing;
Conference_Titel :
Emerging Technologies and Factory Automation, 2006. ETFA '06. IEEE Conference on
Conference_Location :
Prague
Print_ISBN :
0-7803-9758-4
DOI :
10.1109/ETFA.2006.355463