Title :
A class of scheduling problem with chains constrains and processing times constrained by a resource
Author :
Yang Yan ; Hongfeng Wang ; Dingwei Wang ; Dazhi Wang
Author_Institution :
Northeastern Univ., Shenyang
fYear :
2008
fDate :
25-27 June 2008
Firstpage :
9111
Lastpage :
9114
Abstract :
In this paper, a class of single machine resource constrained scheduling problem is investigated. In this model, it is assumed that the jobs are subject to parallel chains precedence constrains. The objective is total weighted completion times. Two versions of problem are addressed. In the first one the chains canpsilat be interrupted, whereas in the second one the chains can be interrupted. For both cases, polynomial algorithms are presented, respectively. We also give an example to illustrate the feasibility of the algorithm.
Keywords :
polynomials; single machine scheduling; parallel chains precedence constrains; polynomial algorithms; processing times; single machine resource constrained scheduling problem; total weighted completion times; Artificial neural networks; Automation; Electronic mail; Gold; Intelligent control; Polynomials; Single machine scheduling; algorithm; chain precedence constrains; resource constrains; scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Control and Automation, 2008. WCICA 2008. 7th World Congress on
Conference_Location :
Chongqing
Print_ISBN :
978-1-4244-2113-8
Type :
conf
DOI :
10.1109/WCICA.2008.4594370
Filename :
4594370
Link To Document :
بازگشت