DocumentCode
2503721
Title
Fuzzy mid term unit commitment considering large scale wind farms
Author
Siahkali, H.
Author_Institution
Islamic Azad Univ., Tehran
fYear
2008
fDate
1-3 Dec. 2008
Firstpage
1227
Lastpage
1232
Abstract
Wind power provides a new challenge to system operators. Unlike conventional power generation sources, wind power generators supply intermittent power because of uncertainty in resource. In a large-scale wind power penetration scenario, wind intermittency could oblige the system operator to allocate the greater reserve power, in order to balance possible errors between predicted and actually wind power output. This would increase total operation cost. This paper presents a new approach to the fuzzy unit commitment problem using mixed integer nonlinear programming (MINLP), considering reserve requirement, load balance and wind power availability constraints. The modeling of constraints is an important issue in power system scheduling. These constraints are therefore ldquofuzzyrdquo in nature, and crisp treatment of them may lead to over conservative solutions. In this paper, a fuzzy optimization-based method is developed to solve power system UC problem with fuzzy objective and constraints. The problem is first converted to a crisp and separable optimization problem. Numerical testing results show that near optimal schedules are obtained, and the method can provide a good balance between reducing costs and satisfying reserve requirements.
Keywords
fuzzy set theory; nonlinear programming; power generation dispatch; power generation scheduling; wind power plants; MINLP; cost reduction; fuzzy mid term unit commitment; fuzzy optimization-based method; fuzzy set theory; large scale wind farms; mixed integer nonlinear programming; numerical testing; power system scheduling; Fuzzy systems; Large-scale systems; Optimal scheduling; Power generation; Power supplies; Power system modeling; Wind energy; Wind energy generation; Wind farms; Wind power generation; Unit commitment; fuzzy decision-making; fuzzy optimization; wind power availability;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Conference, 2008. PECon 2008. IEEE 2nd International
Conference_Location
Johor Bahru
Print_ISBN
978-1-4244-2404-7
Electronic_ISBN
978-1-4244-2405-4
Type
conf
DOI
10.1109/PECON.2008.4762664
Filename
4762664