    Performance of a hydro power plant during black start and islanded operation

  • Author

    Kurup, Sreeram R. ; Ashok, S.

  • Author_Institution
    Dept. of Electr. Eng., Nat. Inst. of Technol. Calicut, Kozhikode, India
  • fYear
    2015
  • fDate
    19-21 Feb. 2015
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    The black start units in a typical hydro-thermal power system will be the hydro power plants since they require very small power to restart after a total shut down, compared to a thermal power plant. They are supposed to start up and supply cranking power to the non-black start units in the system like steam and nuclear power plants. So the time taken for the hydro power plant to start up and start supplying power is an important factor in determining the whole restoration plan of a hydro-thermal power system. This time duration is mainly controlled by the governor and exciter controls during the black start.
  • Keywords
    distributed power generation; hydroelectric power stations; power generation planning; power system restoration; thermal power stations; black start unit operation; hydrothermal power plant system; islanded operation; nonblack start unit; nuclear power plant; power planning system; power restoration system; start up supply cranking power; steam power plant; Circuit breakers; Generators; Hydraulic turbines; Power system restoration; Switches; blackstart; exciter; governor; hydro power plant;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Signal Processing, Informatics, Communication and Energy Systems (SPICES), 2015 IEEE International Conference on
  • Conference_Location
    Kozhikode
  • Type

    conf

  • DOI
    10.1109/SPICES.2015.7091569
  • Filename
    7091569