DocumentCode :
2516090
Title :
Accelerating products under due-date oriented dispatching rules in semiconductor manufacturing
Author :
Rose, Oliver
Author_Institution :
Inst. of Comput. Sci., Wurzburg Univ., Germany
Volume :
2
fYear :
2003
fDate :
7-10 Dec. 2003
Firstpage :
1346
Abstract :
In semiconductor manufacturing facilities, there is often the need to speed up certain product types. This is usually done by either assigning higher priorities or by reducing due dates. We study the effects of accelerating one product type by a tighter due date on the on-time delivery performance of the other products manufactured. It turns out that the results depend on the considered factory, its load, and the accelerated product. As a consequence, it will be hard for production planners to find simple rules of thumb for the effects of accelerating products. In general, detailed simulation experiments will be required.
Keywords :
integrated circuit manufacture; manufacturing processes; production control; production planning; time to market; due-date oriented dispatching rules; on-time delivery performance; product acceleration; semiconductor manufacturing industry; simulation experiment; Acceleration; Chromium; Computer aided manufacturing; Computer science; Dispatching; Electronics industry; Production facilities; Pulp manufacturing; Semiconductor device manufacture; Virtual manufacturing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Conference, 2003. Proceedings of the 2003 Winter
Print_ISBN :
0-7803-8131-9
Type :
conf
DOI :
10.1109/WSC.2003.1261571
Filename :
1261571
Link To Document :
بازگشت