DocumentCode :
2516371
Title :
Simulation based scheduling using a two-pass approach
Author :
Chong, Chin Soon ; Sivakumar, Appa Iyer ; Gay, Robert
Author_Institution :
Singapore Inst. of Manuf. Technol., Nanyang Technol. Univ., Singapore
Volume :
2
fYear :
2003
fDate :
7-10 Dec. 2003
Firstpage :
1433
Abstract :
Bottleneck-based scheduling is a popular approach in production scheduling, and it has achieved promising results in industry. To incorporate this approach in discrete event simulation tools is difficult since the approach requires multiple passes, forward and backward, to reach a good solution for the scheduling problem. We propose a two-pass scheduling approach using discrete-event simulation that takes bottlenecks into consideration. In the first pass, a simulation run is performed and bottlenecks are determined. If significant bottlenecks are identified, a second-pass simulation is performed to reduce the loading on bottlenecks through specific scheduling strategies.
Keywords :
discrete event simulation; lot sizing; optimised production technology; scheduling; semiconductor device manufacture; bottleneck-based scheduling; discrete event simulation; production scheduling; semiconductor device manufacture; two-pass scheduling; Electronics industry; Job shop scheduling; Machine intelligence; Optimized production technology; Processor scheduling; Scheduling algorithm; Semiconductor device manufacture; Semiconductor device testing; System testing; Throughput;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Conference, 2003. Proceedings of the 2003 Winter
Print_ISBN :
0-7803-8131-9
Type :
conf
DOI :
10.1109/WSC.2003.1261586
Filename :
1261586
Link To Document :
بازگشت