• DocumentCode
    2516371
  • Title

    Simulation based scheduling using a two-pass approach

  • Author

    Chong, Chin Soon ; Sivakumar, Appa Iyer ; Gay, Robert

  • Author_Institution
    Singapore Inst. of Manuf. Technol., Nanyang Technol. Univ., Singapore
  • Volume
    2
  • fYear
    2003
  • fDate
    7-10 Dec. 2003
  • Firstpage
    1433
  • Abstract
    Bottleneck-based scheduling is a popular approach in production scheduling, and it has achieved promising results in industry. To incorporate this approach in discrete event simulation tools is difficult since the approach requires multiple passes, forward and backward, to reach a good solution for the scheduling problem. We propose a two-pass scheduling approach using discrete-event simulation that takes bottlenecks into consideration. In the first pass, a simulation run is performed and bottlenecks are determined. If significant bottlenecks are identified, a second-pass simulation is performed to reduce the loading on bottlenecks through specific scheduling strategies.
  • Keywords
    discrete event simulation; lot sizing; optimised production technology; scheduling; semiconductor device manufacture; bottleneck-based scheduling; discrete event simulation; production scheduling; semiconductor device manufacture; two-pass scheduling; Electronics industry; Job shop scheduling; Machine intelligence; Optimized production technology; Processor scheduling; Scheduling algorithm; Semiconductor device manufacture; Semiconductor device testing; System testing; Throughput;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference, 2003. Proceedings of the 2003 Winter
  • Print_ISBN
    0-7803-8131-9
  • Type

    conf

  • DOI
    10.1109/WSC.2003.1261586
  • Filename
    1261586