DocumentCode :
2516743
Title :
Monte Carlo simulation for schedule risks
Author :
McCabe, Brenda
Author_Institution :
Dept. of Civil Eng., Toronto Univ., Ont., Canada
Volume :
2
fYear :
2003
fDate :
7-10 Dec. 2003
Firstpage :
1561
Abstract :
Research was undertaken to assist practitioners in undertaking Monte Carlo simulation of project schedules. A probabilistic model was developed to translate project characteristics into schedule risk boundaries. This model has been tested in several projects and performed very well. Lessons learned during the application of Monte Carlo simulation to a large project are discussed.
Keywords :
Monte Carlo methods; civil engineering computing; construction industry; digital simulation; risk management; scheduling; Monte Carlo simulation; construction engineering; probabilistic model; project characteristics; project schedule; schedule risk; Bayesian methods; Delay effects; Job shop scheduling; Monte Carlo methods; Parameter estimation; Performance evaluation; Productivity; Project management; Subcontracting; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Conference, 2003. Proceedings of the 2003 Winter
Print_ISBN :
0-7803-8131-9
Type :
conf
DOI :
10.1109/WSC.2003.1261603
Filename :
1261603
Link To Document :
بازگشت