DocumentCode
2516806
Title
Railroad simulator on closed loop
Author
Franzese, Luiz Angusto Gago ; Fioroni, Marcelo Moretti ; Botter, Rui Carlos
Author_Institution
Paragon Tecnologia, Sao Paulo, Brazil
Volume
2
fYear
2003
fDate
7-10 Dec. 2003
Firstpage
1602
Abstract
We present the procedure and result of a simulation project of a railroad coal transportation system. Locomotives and wagons are modelled at the system level, as opposed to other work that inserts trains at start of the line, and removes them on the other side, just to analyze line utilization and traffic. The case was based on the Estrada de Ferro Vitoria-Minas (EFVM), managed by Companhia Vale do Rio Doce, one of the biggest iron coal mining companies in the world. The project helped to find the best train size, the impact of various changes on the physical line, the influence of failures and accidents, and provided a fall customized interface, with the ability to do many more experiments.
Keywords
digital simulation; goods dispatch data processing; mining industry; railways; transportation; accidents; closed loop; customized interface; failures; iron coal mining company; locomotives; railroad coal transportation system; railroad simulator; simulation project; train size; wagons; Accidents; Gold; Iron; Project management; Rail transportation; Road transportation; Sea coast; System performance; Telecommunication traffic; Traffic control;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference, 2003. Proceedings of the 2003 Winter
Print_ISBN
0-7803-8131-9
Type
conf
DOI
10.1109/WSC.2003.1261608
Filename
1261608
Link To Document