DocumentCode :
2518265
Title :
Empirical Transformation of Job Shop Scheduling Problem to the Hydraulic Networks Problem in a Water Distribution System
Author :
Cruz-Chávez, Marco Antonio ; Avila-Melgar, Erika Yesenia ; Pérez, Fredy Juárez ; Torres-Sánchez, Wiston G.
Author_Institution :
CIICAp, Univ. Autonoma del Estado de Morelos, Cuernavaca, Mexico
fYear :
2009
fDate :
22-25 Sept. 2009
Firstpage :
76
Lastpage :
81
Abstract :
In this paper an analogy of the job shop scheduling problem to the hydraulic networks problem is presented by mapping this model of scheduling, using as a base the disjunctive graph model. The mapping carried out allows visualization of the hydraulic networks problem as an NP-complete model with constraints defined in the job shop scheduling problem. The mapping presented indicates that the hydraulic networks problem is a difficult problem to solve by using an approach with the constraints of an NP-complete problem.
Keywords :
computational complexity; graph theory; job shop scheduling; water supply; NP-complete model; disjunctive graph model; hydraulic network problem; job shop scheduling problem; water distribution system; Automotive engineering; Costs; Job shop scheduling; Mesh networks; NP-complete problem; NP-hard problem; Polynomials; Quality of service; Robots; Visualization;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electronics, Robotics and Automotive Mechanics Conference, 2009. CERMA '09.
Conference_Location :
Cuernavaca, Morelos
Print_ISBN :
978-0-7695-3799-3
Type :
conf
DOI :
10.1109/CERMA.2009.33
Filename :
5342010
Link To Document :
بازگشت