• DocumentCode
    2518369
  • Title

    CRONOS-II: a knowledge-based scheduler for complex manufacturing environments

  • Author

    Canzi, Ulrico ; Guida, Giovanni ; Poloni, Walter ; Pozzi, Silvano

  • Author_Institution
    CEFRIEL, Politecnico di Milano, Italy
  • fYear
    1989
  • fDate
    16-18 Oct 1989
  • Firstpage
    76
  • Lastpage
    83
  • Abstract
    The authors describe CRONOS-II, a knowledge-based scheduler that can model both technological and temporal constraints needed to represent realistic production plans. This scheduler is able to decompose the execution of elementary tasks into parts. Furthermore, it offers the possibility to control the global quality of the produced schedules. From the technical point of view, it implements a depth-first heuristic-guided search joined to an original failure-driven backtracking mechanism
  • Keywords
    knowledge based systems; manufacturing data processing; production control; scheduling; CRONOS-II; complex manufacturing environments; decompose; depth-first heuristic-guided search; elementary tasks; global quality; knowledge-based scheduler; original failure-driven backtracking; parts; realistic production plans; technological constraints; temporal constraints; Artificial intelligence; Constraint theory; Dispatching; Job shop scheduling; Manufacturing processes; Processor scheduling; Production facilities; Production systems; Time factors; Virtual manufacturing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Data and Knowledge Systems for Manufacturing and Engineering, 1989., Second International Conference on
  • Conference_Location
    Gaithersburg, MD
  • Print_ISBN
    0-8186-1983-X
  • Type

    conf

  • DOI
    10.1109/DKSME.1989.107444
  • Filename
    107444