• DocumentCode
    2525511
  • Title

    SESFAC: a scheduling expert system for flexible assembly cells

  • Author

    Van Brussel, H. ; Cottrez, F. ; Valckenaers, P.

  • Author_Institution
    Dept. of Mech. Eng., Katholieke Univ., Leuven, Belgium
  • fYear
    1990
  • fDate
    13-18 May 1990
  • Firstpage
    1950
  • Abstract
    The design of a knowledge-based scheduling system for a flexible assembly cell is discussed. The system integrates disruptions and can be connected to a real-time cell controller. It is composed of a static database, a dynamic database, and expert modules and is driven by an asynchronous clock. The knowledge is hierarchically organized in the distinct expert modules, each standing for a decision level. The scheduler is characterized by a scheduling-in-advance methodology. This capability is to be used on- or offline
  • Keywords
    assembling; expert systems; flexible manufacturing systems; production control; SESFAC; asynchronous clock; dynamic database; flexible assembly cells; knowledge-based scheduling system; production control; real-time cell controller; scheduling expert system; scheduling-in-advance methodology; static database; Assembly systems; Control systems; Databases; Expert systems; Job shop scheduling; Manufacturing automation; Production control; Production planning; Robotic assembly; Robotics and automation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics and Automation, 1990. Proceedings., 1990 IEEE International Conference on
  • Conference_Location
    Cincinnati, OH
  • Print_ISBN
    0-8186-9061-5
  • Type

    conf

  • DOI
    10.1109/ROBOT.1990.126293
  • Filename
    126293