Title :
Raise of effectiveness of repairs planning of an electronetwork equipment
Author :
Levin, V.M. ; Ujencev, D.
Author_Institution :
Novosibirsk State Tech. Univ., Russia
Abstract :
Operating a normative system of planned preventive repairs (PPR) with positive qualities has a series of shortages, the principal of which is the unreasonable overestimate of the volumes of fulfilled repair work and magnitudes of repair fund of the firm. The alternative of PPR is the repair on the real technical state of equipment (RTS), at which are assigned defined periodicity and volume of diagnostic check, the overhaul resource of equipment and volume of repair work on elimination of detected problems
Keywords :
maintenance engineering; planning; power apparatus; Russian power engineering; detected problems elimination; diagnostic check; electronetwork equipment; overhaul resource; planned preventive repairs; real technical state of equipment; repair fund; repair work; repairs planning; Computer crashes; Costs; Electric variables measurement; Information security; Life testing; Manufacturing automation; Qualifications; Substations; Voltage; Volume measurement;
Conference_Titel :
Science and Technology, 1999. KORUS '99. Proceedings. The Third Russian-Korean International Symposium on
Conference_Location :
Novosibirsk
Print_ISBN :
0-7803-5729-9
DOI :
10.1109/KORUS.1999.876279