• DocumentCode
    2528179
  • Title

    Just how real is the SIA roadmap

  • Author

    Needham, Wayne

  • Author_Institution
    Intel Corp., Chandler, AZ, USA
  • fYear
    1998
  • fDate
    18-23 Oct 1998
  • Firstpage
    1151
  • Abstract
    We debate the potential rocks listed in the Test section of The National Technology Roadmap for Semiconductors 1997. The 1997 Test Roadmap changed dramatically the numbers presented in the 1994 Test Roadmap. We can still question the speeds, currents, DFT and pins in the Roadmap. At the same time, we question is it real and what is our future? What we need to think of as challenges is not the lines in the roadmap, but the directions, walls and methods to get around those lines. In much the same way as testers evolved from shared resource to per pin architecture, we need to adapt to the needs of the roadmap. Either find ways to achieve the timing, power, and costs or someone else will do it for us. That someone could be circuit design, process design or a completely new test paradigm
  • Keywords
    automatic test equipment; automatic testing; electronics industry; integrated circuit testing; 1997 Test Roadmap; CMOS power; Moore´s law; National Technology Roadmap for Semiconductors; SIA roadmap; circuit design; costs; increased transistor density; new test paradigm; process design; roadmaps value; timing accuracy; Circuit testing; Electronics industry; Extrapolation; Industrial electronics; Lithography; Moore´s Law; Pins; Semiconductor device testing; Test equipment; Timing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Test Conference, 1998. Proceedings., International
  • Conference_Location
    Washington, DC
  • ISSN
    1089-3539
  • Print_ISBN
    0-7803-5093-6
  • Type

    conf

  • DOI
    10.1109/TEST.1998.743350
  • Filename
    743350