DocumentCode
2530486
Title
Shihmen sediment prevention diversion tunnel planning and design
Author
Hou, Ho Shong ; Lee, Mingshun ; Hou, Percy
Author_Institution
Marine Environ. & Eng., Nat. Sun Yat Sen Univ., Kaohsiung, Taiwan
fYear
2010
fDate
2-4 June 2010
Firstpage
1
Lastpage
8
Abstract
Shihmen reservoir was started in May 1963. The main purposes of Shihmen reservoir are for agriculture, power supply, flood control and tourism. Shihme Asn dam is an earth dam. Its crown height is 133m above mean sea level, with length 360 m, watershed 763.4 km2, and maximum volume 309 million cms. Turbidity in Shihmen dam was severely affected by typhoons Aere (2004) and Masa (2005). Increased deposition after Aere was 28 million cms. Turbidity at Shihmen Canal Inlet is 3000 NTU (Nephelometry Turbidity Unit). Sediment sluicing strategies for downstream channel are demanded. Therefore, diversionary sediment preventing channel is planned in the upstream of Shihmen reservoir. Finally, turbid flow in tunnel channel is bypassed and diverted its flow down to downstream.
Keywords
dams; design engineering; geotechnical engineering; process planning; reservoirs; structural engineering; tunnels; Shihme Asn dam; Shihmen reservoir; diversion tunnel planning; earth dam; flood control; sediment prevention; sediment sluicing strategies; tunnel design; Desalination Diversion tunnel; NTU; Nephelometry turbidity unit;
fLanguage
English
Publisher
ieee
Conference_Titel
Energy and Sustainable Development: Issues and Strategies (ESD), 2010 Proceedings of the International Conference on
Conference_Location
Chiang Mai
Print_ISBN
978-1-4244-8563-5
Type
conf
DOI
10.1109/ESD.2010.5598793
Filename
5598793
Link To Document