Abstract
Many software project lag behind schedule because in actual work activity duration get changed due to unexpected things, hence this study considers different duration types of the same activity. This system considers activity which is time-dependent, random and normal. Objective is to schedule software project using time-dependent and random activities within deadline. This type of project cannot be schedule using simple critical path method. Hence we integrate critical path method and stochastic technique to find stochastic critical path.
Keywords
critical path analysis; genetic algorithms; project management; scheduling; software management; stochastic processes; critical path method; genetic processes; random activities; software project scheduling; stochastic critical path model; stochastic technique; time-constraint activity scheduling; time-dependent activities; uncertainty genetic algorithm; Biological cells; Probabilistic logic; Probes; Reactive power; Software; Genetic optimization; Stochastic Critical path;
fLanguage
English
Publisher
ieee
Conference_Titel
Recent Advances and Innovations in Engineering (ICRAIE), 2014
Conference_Location
Jaipur
Print_ISBN
978-1-4799-4041-7
Type
conf
DOI
10.1109/ICRAIE.2014.6909196
Filename
6909196
Link To Document