Abstract
The Danish power system is characterised by a high share of wind power production. Most of the wind power has so far been distributed onshore and connected to the lower voltage levels. The recent tendency is to group it in large offshore wind farms. The wind farms are often connected directly to the high voltage network via long AC cable lines compensated by shunt reactors. These cable connections impose some additional challenges that should be considered in the planning stage. This paper presents the recent experience of the Danish TSO with long cable connections of wind farms and shows the results of selected simulation studies made of the planned Horns Rev B wind farm connection.
Keywords
power cables; power generation planning; wind power plants; AC cable lines; Danish TSO; offshore wind farm cable connections; power system planning; shunt reactors; transmission system operator; wind power; Impedance; Inductors; Power cables; Power system planning; Power system transients; Shunt (electrical); Voltage; Wind energy; Wind farms; Wind turbines; Harmonic analysis; Impedance; Inductors; Power cables; Power system transients; Voltage control; Wind power generation;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century, 2008 IEEE
Conference_Location
Pittsburgh, PA
ISSN
1932-5517
Print_ISBN
978-1-4244-1905-0
Electronic_ISBN
1932-5517
Type
conf
DOI
10.1109/PES.2008.4596124
Filename
4596124
Link To Document