    Selected studies on offshore wind farm cable connections - challenges and experience of the Danish TSO

  • Author

    Wiechowski, W. ; Eriksen, P. Børre

  • Author_Institution
    Dept. of Planning, Energinet.dk, Fredericia
  • fYear
    2008
  • fDate
    20-24 July 2008
  • Firstpage
    1
  • Lastpage
    8
  • Abstract
    The Danish power system is characterised by a high share of wind power production. Most of the wind power has so far been distributed onshore and connected to the lower voltage levels. The recent tendency is to group it in large offshore wind farms. The wind farms are often connected directly to the high voltage network via long AC cable lines compensated by shunt reactors. These cable connections impose some additional challenges that should be considered in the planning stage. This paper presents the recent experience of the Danish TSO with long cable connections of wind farms and shows the results of selected simulation studies made of the planned Horns Rev B wind farm connection.
  • Keywords
    power cables; power generation planning; wind power plants; AC cable lines; Danish TSO; offshore wind farm cable connections; power system planning; shunt reactors; transmission system operator; wind power; Impedance; Inductors; Power cables; Power system planning; Power system transients; Shunt (electrical); Voltage; Wind energy; Wind farms; Wind turbines; Harmonic analysis; Impedance; Inductors; Power cables; Power system transients; Voltage control; Wind power generation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century, 2008 IEEE
  • Conference_Location
    Pittsburgh, PA
  • ISSN
    1932-5517
  • Print_ISBN
    978-1-4244-1905-0
  • Electronic_ISBN
    1932-5517
  • Type

    conf

  • DOI
    10.1109/PES.2008.4596124
  • Filename
    4596124