Title :
Minimizing the number of machines in the Fixed Interval Scheduling Problem with energy constraints
Author :
Orta-Lozano, Minerva Mayela ; Villarreal, Bernardo
Author_Institution :
Dept. de Ing., Univ. de Monterrey, San Pedro Garza Garcia, Mexico
Abstract :
This paper has the purpose of describing the efforts of a Mexican company with several galvanizing lines, located in Monterrey, Mexico, to diminish setup time. The firm´s operations strategy requires a better performance of the plant in terms of line capacity utilization, more productivity and quicker response to market´s orders. The setup reduction project set to obtain those goals was organized to attack two fronts; The reduction of the time per setup, and the decrease of the number of setups.
Keywords :
production management; productivity; strategic planning; Mexican company; Monterrey; firms operations strategy; line capacity utilization; productivity; setup time reduction; Coils; Color; Painting; Production; Sequential analysis; Steel; Interval scheduling problem; approximation algorithms; complexity; energy constraints; heuristics;
Conference_Titel :
Industrial Engineering and Operations Management (IEOM), 2015 International Conference on
Conference_Location :
Dubai
Print_ISBN :
978-1-4799-6064-4
DOI :
10.1109/IEOM.2015.7093894