DocumentCode
2535613
Title
Dynamic production scheduling in computer-aided fabrication of integrated circuits
Author
Lozinski, Christopher ; Gershwin, Stanley B.
Author_Institution
Massachusetts Institute of Technology, Cambridge, Massachusetts, USA
Volume
3
fYear
1986
fDate
31503
Firstpage
660
Lastpage
663
Abstract
The scheduling of a V.L.S.I. manufacturing facility is being studied using M.I.T.´s new V.L.S.I. Research Laboratory (V.R.L.) as a testbed. This paper describes the facility, outlines the scheduling methodology that is under investigation and presents the design of the initial preliminary scheduling system.
Keywords
Chemical industry; Circuit testing; Delay; Dynamic scheduling; Fabrication; Interference constraints; Job shop scheduling; Laboratories; Processor scheduling; Production;
fLanguage
English
Publisher
ieee
Conference_Titel
Robotics and Automation. Proceedings. 1986 IEEE International Conference on
Type
conf
DOI
10.1109/ROBOT.1986.1087636
Filename
1087636
Link To Document