DocumentCode :
2535620
Title :
FMS scheduling: A crucial element in an expert system control structure
Author :
Kusiak, Andrew
Author_Institution :
University of Manitoba, Winnipeg, Manitoba, Canada
Volume :
3
fYear :
1986
fDate :
31503
Firstpage :
653
Lastpage :
658
Abstract :
In this paper a structure of the manufacturing expert system is presented. This system is to control three subsystems: process planning, programming of robots and machines and production planning. One of the basic elements of the production planning system is the production scheduling. A scheduling framework together with the heuristic scheduling algorithm are developed. The algorithm is illustrated on a numerical example.
Keywords :
Control systems; Expert systems; Flexible manufacturing systems; Job shop scheduling; Process control; Process planning; Production planning; Production systems; Pulp manufacturing; Robot programming;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Robotics and Automation. Proceedings. 1986 IEEE International Conference on
Type :
conf
DOI :
10.1109/ROBOT.1986.1087637
Filename :
1087637
Link To Document :
بازگشت