The right use of “with and without antitheses” in the post evaluation of construction projects —Using Lianxu speedway project as an example
Author
Wang Ying ; Liu Sifeng ; Wu Hecheng
Author_Institution
Nanjing Univ. of Aeronaut. & Astronaut., Nanjing
fYear
2007
fDate
7-10 Oct. 2007
Firstpage
2165
Lastpage
2169
Abstract
More and more importance is attached to the post evaluation of the constructing projects. Traditional "with and without antitheses" is a commonly used method in post evaluation, which is biased and insufficient in practical use and needs to be improved. Using Lianxu speedway project as an example, traditional and improved "with and without antitheses" are used respectively to evaluate the impact of this project on the economic growth of circumjacent area. It is concluded through contrastive analysis that the improved "with and without antitheses" is a new idea of using this antithesis, which better modifies the bias and insufficiency of the traditional method and provides reference for the post evaluation of the following projects.
Keywords
PERT; civil engineering; road building; Lianxu speedway project; construction projects; economic growth; project post evaluation; with and without antitheses; Cities and towns; Decision making; Design engineering; Economic indicators; Educational programs; Investments; Job design; Project management; Systems engineering and theory; Technological innovation;
fLanguage
English
Publisher
ieee
Conference_Titel
Systems, Man and Cybernetics, 2007. ISIC. IEEE International Conference on
Conference_Location
Montreal, Que.
Print_ISBN
978-1-4244-0990-7
Electronic_ISBN
978-1-4244-0991-4
Type
conf
DOI
10.1109/ICSMC.2007.4413631
Filename
4413631
Link To Document