    The right use of “with and without antitheses” in the post evaluation of construction projects —Using Lianxu speedway project as an example

  • Author

    Wang Ying ; Liu Sifeng ; Wu Hecheng

  • Author_Institution
    Nanjing Univ. of Aeronaut. & Astronaut., Nanjing
  • fYear
    2007
  • fDate
    7-10 Oct. 2007
  • Firstpage
    2165
  • Lastpage
    2169
  • Abstract
    More and more importance is attached to the post evaluation of the constructing projects. Traditional "with and without antitheses" is a commonly used method in post evaluation, which is biased and insufficient in practical use and needs to be improved. Using Lianxu speedway project as an example, traditional and improved "with and without antitheses" are used respectively to evaluate the impact of this project on the economic growth of circumjacent area. It is concluded through contrastive analysis that the improved "with and without antitheses" is a new idea of using this antithesis, which better modifies the bias and insufficiency of the traditional method and provides reference for the post evaluation of the following projects.
  • Keywords
    PERT; civil engineering; road building; Lianxu speedway project; construction projects; economic growth; project post evaluation; with and without antitheses; Cities and towns; Decision making; Design engineering; Economic indicators; Educational programs; Investments; Job design; Project management; Systems engineering and theory; Technological innovation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems, Man and Cybernetics, 2007. ISIC. IEEE International Conference on
  • Conference_Location
    Montreal, Que.
  • Print_ISBN
    978-1-4244-0990-7
  • Electronic_ISBN
    978-1-4244-0991-4
  • Type

    conf

  • DOI
    10.1109/ICSMC.2007.4413631
  • Filename
    4413631