  • Title

    Restoration plan — The Hydro-Québec experience

  • Author

    Lévesque, François ; Phan, Si Truc ; Dumas, Anyk ; Boisvert, Martin

  • Author_Institution
    Oper.&Planning at Hydro-Quebec TransEnergie, Montreal, QC
  • fYear
    2008
  • fDate
    20-24 July 2008
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    The purpose of the restoration plan is to provide power to customer as fast as possible without compromise the integrity of the equipment. The condition of the restoration electrical system is not familiar to the operation personnel. The particular structure of Hydro-Quebecpsilas power system requires the use of a highly specific system restoration procedure. The restoration plan is therefore based on a precise restoration reference that has been validated by appropriated off line studies while allowing needed flexibility. Over the years, Hydro-Quebec has accumulated a sizeable pool of knowledge that brings together all the solutions already studied or learned. System restoration planners use their know-how to find the best solution and can be now determine the best procedure to apply.
  • Keywords
    hydroelectric power stations; power system restoration; power transmission planning; Hydro-Quebec power system; electrical system; off line studies; operation personnel; system restoration plan; transmission network; Hydroelectric power generation; Personnel; Power generation; Power system interconnection; Power system restoration; Power systems; Rivers; Shunt (electrical); Transportation; Voltage; Restoration; Restoration plan;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century, 2008 IEEE
  • Conference_Location
    Pittsburgh, PA
  • ISSN
    1932-5517
  • Print_ISBN
    978-1-4244-1905-0
  • Electronic_ISBN
    1932-5517
  • Type

    conf

  • DOI
    10.1109/PES.2008.4596551
  • Filename
    4596551