Title :
Redispatch to reduce rotor shaft impacts upon transmission loop closure
Author :
Martins, Nelson ; De Oliveira, Edimar ; Moreira, Weberson ; Pereira, J. ; Fontoura, Rafael
Author_Institution :
CEPEL, Sao Paulo
Abstract :
Summary form only given. This paper describes a novel generation rescheduling method to reduce the generator rotor shaft impacts induced by transmission loop closures. The rotor shaft impact constraints, at the instant of transmission loop closure, are explicitly modeled into an interior point optimal power flow. This method represents a considerable improvement on the conventional redispatch for reducing the standing phase angle of the closing breaker. Optimal power flow and transient stability results are provided for a tutorial 4-bus and the IEEE 118-bus test systems.
Keywords :
power generation scheduling; power system stability; rotors; shafts; IEEE 118 bus test system; closing breaker; interior point optimal power flow; redispatch; rescheduling method; rotor shaft impacts; standing phase angle; transient stability; transmission loop closure; tutorial 4 bus test system; Load flow; Power system modeling; Rotors; Shafts; Stability; System testing;
Conference_Titel :
Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century, 2008 IEEE
Conference_Location :
Pittsburgh, PA
Print_ISBN :
978-1-4244-1905-0
Electronic_ISBN :
1932-5517
DOI :
10.1109/PES.2008.4596744