• DocumentCode
    2546245
  • Title

    Scheduling Algorithm with Respect to Resource Intermittence in Mobile Grid

  • Author

    Du Li-Juan ; Yu Zhen-wei

  • Author_Institution
    Dept. of Electron. Inf. Eng., North China Inst. of Sci. & Technol., Beijing, China
  • fYear
    2010
  • fDate
    23-25 Sept. 2010
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    In mobile grid environment, intermittent connectivity of mobile device brings large challenge for schedule. Based on distributed schedule model, the problem of task schedule in mobile grid is formulated. MGRR algorithm is presented for scheduling independent tasks with same length onto mobile grid with dynamic performance resources. Making use of re-scheduling and replication, the proposed algorithm does not use any prediction information on the performance of resources and adapts to intermittent connectivity of mobile resource. The MGRR algorithm´s objective function is total processor cycle consumption, which is the total number of instructions consumed for a application during schedule. At last the performance of MGRR is analyzed and the simulation result is given.
  • Keywords
    grid computing; mobile computing; mobile radio; scheduling; MGRR algorithm; distributed schedule model; dynamic performance resources; independent task scheduling; intermittent connectivity; mobile device; mobile grid; mobile resource; replication; rescheduling; resource intermittence; scheduling algorithm; Dynamic scheduling; Heuristic algorithms; Mobile communication; Mobile computing; Mobile handsets; Processor scheduling; Schedules;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Wireless Communications Networking and Mobile Computing (WiCOM), 2010 6th International Conference on
  • Conference_Location
    Chengdu
  • Print_ISBN
    978-1-4244-3708-5
  • Electronic_ISBN
    978-1-4244-3709-2
  • Type

    conf

  • DOI
    10.1109/WICOM.2010.5600181
  • Filename
    5600181